The pipes in the corridor were rearranged, the outer wall was added with insulation layer, and a sensor light was added at the entrance of the unit. These changes were not big at first glance, but for residents who had lived for 30 years, they felt obvious.
Different from the previous round of renovation based on demolition and construction, the current renovation is more based on courtyards and blocks, emphasizing "retaining people" rather than "replacing people". This brings a technical problem: how to apportion the renovation cost within the old residential area with scattered property rights.
Consensus is harder than funding
A number of project leaders mentioned that the most time-consuming link is consultation. Adding elevators involves the interests of low-rise residents, pipeline reconstruction needs to enter the home, and re-division of parking spaces will touch existing habits. If no consensus is reached on any one item, the overall progress will stagnate.
"Money can be applied for, consensus application does not come." A street worker said.Some places try to use the "transformation menu" approach, splitting projects into mandatory and optional options, which residents vote on by building. Financial funds cover basic items, and improvement items are shared by residents and public funds. This practice reduces the probability of overall veto.
Another repeatedly mentioned risk is the rent increase after renovation. Some cities raise affordable rental housing simultaneously in the renewal area to reduce the passive relocation of the original residents. The effect still needs to be observed in a longer period.